          Currently, there are 4 NEWater plants in Singapore. The latest and the largest NEWater plant at Changi with a capacity of 50mgd was opened in May 2010. With this addition, coupled with the expansion of the existing plants, NEWater now meets 30% of Singapore’s total water demand. By 2060, NEWater is projected to meet 50% of Singapore’s future water demand.

         The NEWater Visitor Centre, which was opened in February 2003, is the focal point of PUB’s public education on NEWater. The centre highlights the importance of water and how Singapore leverages on advances in technology to reclaim water. Visitors are able to view firsthand the operation of the advanced dual membrane and ultraviolet technologies used to produce NEWater.